header-langage
简体中文
繁體中文
English
Tiếng Việt
한국어
日本語
ภาษาไทย
Türkçe
Scan to Download the APP
Partnered With:

The deadline for Blast's regular withdrawal interface has arrived, with $40.41 million in assets still pending withdrawal on the bridge.

BlockBeats news, October 26: Blast reached the deadline for its regular withdrawal interface today, but approximately $40.41 million in assets remain in its official Ethereum mainnet cross-chain bridge. The amount has decreased by about 36% from approximately $63.5 million on October 2. Blast announced on October 2 that it would gradually shut down the Layer 2 network, citing operating costs exceeding revenue and the lack of a credible path to economic sustainability.


Blast previously stated that after October 26, users can still withdraw assets, but they need to interact directly with the bridge contract on Ethereum rather than relying on the regular website interface. As of the time of reporting, Blast's official website still displays the withdrawal portal and a notice about the network's gradual shutdown. Blast has published contract-level withdrawal guides for ETH, USDB, and BLAST. The relevant operations involve initiating a withdrawal on the Blast network, waiting for the transaction's corresponding state record to be submitted to Ethereum, submitting the withdrawal proof through the OptimismPortal contract, and then going through a one-day challenge period and executing the final confirmation transaction.

举报 Correction/Report
RelatedRecommended
The harsher the curse, the higher the traffic. Is the big one really coming?
Good morning! Here is a summary of important news in the cryptocurrency industry from last night and this morning on March 1st.
GM! A list of important information in the encryption industry last night and this morning on January 17th
Correction/Report
Submit
Add Library
Visible to myself only
Public
Save
Choose Library
Add Library
Cancel
Finish